91sex国产-91sex在线观看免费-91se精品免费观看-91se在线-91se在线观看

Power SPD Box
Power Lightning Protection Module
Network Signal SPD
Video Signal SPD
Audio Signal SPD
Control Signal SPD
Monitor SPD
Supply Power SPD
Other accesories
·  1
·  1
·  1
·  1
·  1


 

Advanced Current Discharge Lightning Rod


 

 Working Principle:

 Lightning Rod mainly absorb and store energy by stimulate device from the nature of the electric field. Reflector and a small tip have a good electrical connection with the earth, in the potential state. So usually, there is a electric field strength between the reflector and stimulate device, whenever flash occurs the electric field strength will increase rapidly, the potential difference between the stimulate device and the reflector is roughly equivalent to thundercloud and the earth potential, the voltage drop between them will result in rapid increase in cutting-edge ignition, and to ionization of air around the tip to form a point discharge phenomenon. The central collection stem and stimulate device of lightning rod make air ionization at top end caused by the rapid electric field increase in a very short and accurate time.

Instruction:

1. The central collection stem.

2. Reflector.

3. Trigger device.

4. Stimulate device.

5. Stimulate device fixed board

6. Stimulate device is insulated with reflector and central collection stem;

7. Reflector has a good electrical connection with central collection stem and the earth; the bottom case of stimulate device is made of plasthetics which is applicable to any corrosive conditions.


Product installation, use and maintenance.

1. The lightning rod should be installed in the tower, tower or other buildings, the flange plate of lightning rod must be higher above 1.5m than the highest protection, according to this requirement to heighten tower or set tower height.

2. Get rid of installing and testing of lighting rod on the thunderstorm day.

3.The grounding devices of lightning rod can use two round or flat steels direction by 180°at one end to weld he tower leg or foot tower, the other side can reliably weld with lightning belt on the parapet, or be separately down and reliably welded with independent ground network.

4. Make regular inspections (once a year) to make sure the connection of the lightning rod the screw, welding is solid or not, ground down-lead is connected with the grounding system reliably or not. If we find that connection of the screw, weld is corroded serious; we shall replace the screw to re-connect, re-soldering the original weld.

Start beat time:

          Name

         Type

    Start beat time  ⊿t

 

Discharging in advance lightning rod

     JM-BLZ

           25µs

     JM-BLZ

34µs

     JM-BLZ

43µs

     JM-BLZ

52µs

Home | About Us | Prodcuts | Applications Cases | Sales Network | Honors | Order Online | Contact Us

Copyright © 2013  Shenzhen Jiaming Lightning Protection Technology Co., Ltd.
  Add:7F,Beifangjunyi Business Center, Baoan, Shenzhen, Guangdong 

Contact Us:Miss Liu  Tel:18823851018  E-mail:lily97008@sina.com


主站蜘蛛池模板: 国产精品视频一区二区三区不卡 | 夜夜嘿视频免费看 | 国产床戏做爰免费观看网站 | 老司机观看精品一区二区 | 国产日韩在线观看视频网站 | 婷婷四房综合激情五月性色 | 爱爱永久免费视频网站 | 精产网红自拍在线 | 国产在线观看免费 | 亚洲一区二区三区高清 | 日韩中文在线视频 | 欧美视频第一页 | 国产在线爱做人成小视频 | 成人福利在线播放 | 国产香港特级一级毛片 | 成人 亚洲 | 欧美高清激情毛片 | 麻豆影视视频高清在线观看 | 日韩大片观看网址 | 久久精品国产99国产精偷 | 激情视频在线观看网站 | xxxxx色| 色yeye成人免费视频 | 国产一级做a爰片在线看 | 精品国产福利在线 | 黄色网址免费在线播放 | 欧美一级α片毛片免费观看 | 国产成人精品视频 | 在线成人 | 在线免费黄 | 国产淫视 | 一级一级人与动毛片 | 国产黄色一级大片 | 久久婷婷国产综合精品青草 | 国精品一区二区三区 | 欧美黑人白人bbw | 1国产精品卡1卡2卡3 | 国产一级一级一级成人毛片 | 亚洲妇熟xxxxx妇色黄 | 女人被狂躁的视频免费免费看 | 久久好色 |